Free Samples
COIT11226 System Analysis
.cms-body-content table{width:100%!important;} #subhidecontent{ position: relative;
overflow-x: auto;
width: 100%;}
COIT11226 System Analysis
0 Download5 Pages / 1,144 Words
Course Code: COIT11226
University: Central Queensland University
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Question:
Task 1. System Development MethodologyProvide a short description of each of the following system development methodologies, and then compare the two. The comparison should describe the advantages and disadvantages of one methodology versus the other.Modified Waterfall ModelUnified ProcessNote that this question is not specific for the Scenario.What to include in your report for this task? 1. Description of both methodologies 2. Comparison of the methodologiesTask 2. Work Breakdown StructureFor the Online Mercy Hospital Pharmacy system Project, assume you have chosen Modified Waterfall Model as a Methodology. Create a Work Breakdown Structure (WBS).The WBS must be created as a table, either directly in your MS Word report, or using other software (e.g. Excel, Project) and then copied/imported into your report. If you use other software, then you do not need to submit the original file. The WBS must contain only the following columns:Task ID Task descriptionEstimated duration/effort (in days)Predecessor Task ID(s)What to include in your report for this task?1. The Work Breakdown Structure (a table).
Task 3. Project Gantt ChartFor the Online Mercy Hospital Pharmacy system, create a Gantt chart of the project. You must include allocation of personnel. Also provide an explanation of the Gantt chart, including any assumptions that were made in preparing it.What to include in your report for this task?1.A screenshot or copy-and-paste of the full Gantt chart. You MUST also submit the original MS Project file2.Explanation of Gantt chart and any assumptionsTask 4. Economic Cost Feasibility/ Project BudgetingConduct a 5-year cost/benefit analysis by:1.Create an Excel spreadsheet in common format.2.Explain the breakeven period for the project, including what does breakeven period mean,what is the value for this project, and what that value means to the customer.3.Explain the return on investment for the project, including when does return on investment mean, what is the value for this project, what that values means to the customer, and whether the project is worthwhile and should be continued or not.What to include in your report for this task?1.A screenshot or copy-and-paste of the cost/benefit analysis spreadsheet. You MUST also submit the original MS Excel file.2.Answers about the breakeven period3.Answers about the return on investment
Answer:
System Development Methodology
Modified Waterfall Model: The system development methodology utilizes the same phases as in waterfall model with a simple addition of the overlapping function (Model 2015). The overlapping functions help in splitting the projects in subprojects for ensuring that each of the sub projects are completed successfully.
Unified Process: The unified process is implied as an iterative, incremental, and development process that can be used for software development in form of a process framework (Hui, Yan, Quanyu and Zhiwen 2015). The unified process is not a process, but it is a structural framework that can be specified for organizational projects.
Unified Process
The disciplines of the modified waterfall model such as analysis, design, coding, and testing are done sequentially
The disciplines of the modified waterfall model such as analysis, design, coding, and testing are done concurrently and iteratively
Not Multi Disciplinary in nature
Multi Disciplinary in nature
Artefacts of the process are Document Heavy
Artefacts of the process are visual concept based
Task Description
Duration
Predecessors Task ID
0
Online Mercy Hospital Pharmacy System
116 days
1
Initialization
20 days
1.1
Analysis of the requirements
4 days
1.2
Scope Analysis
3 days
1.1
1.3
Risk Management Plan
5 days
1.2
1.4
Charter Documentation
3 days
1.3
1.5
Project Initiation Documentation
3 days
1.4
1.6
Review and Signup
2 days
1.5
2
Planning
11 days
2.1
Plan Selection Methodology
2 days
1.6
2.2
Development of plan outline
5 days
2.1
2.3
Review of the plan outline
3 days
2.2
2.4
Plan Approval
1 day
2.3
3
System Designing
28 days
3.1
Hospital Infrastructure is analyzed
3 days
2.4
3.2
System Requirements are accumulated
7 days
5.4
3.3
Design Methodology is selected
2 days
3.2
3.4
Design outline is made
5 days
3.3
3.5
Design is reviewed
2 days
5.3
3.6
Design is approved
1 day
3.5
4
System Development
48 days
4.1
Platform for integration is selected
2 days
3.6
4.2
Integrated database is formed
8 days
4.1
4.3
Data in stored in the database
4 days
4.2
4.4
Equipments are Installed
10 days
4.3
4.5
Software are programmed
15 days
4.4
4.6
System is completed
1 day
5.2
5
Testing
72 days
5.1
White box testing
4 days
4.5
5.2
Black box testing
4 days
5.1
5.3
Simulation testing
4 days
3.4
5.4
Prototyping
4 days
3.1
6
Closure Phase
9 days
6.1
Final Documentation
5 days
4.6
6.2
Submission of documents
1 day
6.1
6.3
Review and Signup
2 days
6.2
6.4
Project is Closed
1 day
6.3
Table 1: WBS of the Project
From the Gantt chart it is clear that the project is divided into the following subprojects initialization, planning, system designing, system development, testing, and closure phase. The initialization phase consists of analysis of the requirements, scope analysis, risk management plan, charter documentation, project initiation documentation, and review and signup. The planning phase consists of plan selection methodology, development of plan outline, review of the plan outline, and plan approval. The system designing phase consists of hospital infrastructure is analysed, system requirements are accumulated, design methodology is selected, design outline is made, design is reviewed, and design is approved. The system development phase consists of platform for integration is selected, integrated database is formed, data in stored in the database, equipments are installed, software are programmed, and system is completed. The testing phase consists of white box testing, black box testing, simulation testing, and prototyping. The closure phase consists of submission of documents, final documentation, review and signup, and project is closed.
The break even period (or point) is the time period for which the sum of the overall investment is equal to the sum of the benefits for given discounting rate (Rout, Sahoo, Thomas and Varghese 2017). The time is said to be breakeven point for the initial investment at the given rate of return. The breakeven point for the project is 2.57 years for 7%. The payback period is the breakeven point of the project for the customers.
ROI of return on investment is the rate by which the investment of the project is returned to the client (Frost, Sonfield, Zolna and Finer 2014). The yearly benefits are summed and lessened from the yearly expense. The remaining amount is divided from the initial investment and then percentage is calculated for developing the ROI. The ROI for this project is 30%. The NPV value of the project has been calculated to be positive and hence, the project should be proceeded with.
Bibliography
Adamson, P.B., Roberts, G.J., Gu, N.Y., Bharmi, R., Desai, A.S. and Abraham, W.T., 2016. Economic Impact of Hemodynamic Monitoring in Heart Failure Patients: Estimating the Number-Needed-to-Treat and the Break-Even-Point Using a Claims Database. Journal of Cardiac Failure, 22(8), p.S87.
Anwar, A., 2014. A review of rup (rational unified process). International Journal of Software Engineering (IJSE), 5(2), pp.12-19.
Bahrudin, I.A., 2016. A comparative study of user acceptance testing between modified waterfall model and extreme programming in small-scale project (Doctoral dissertation, Universiti Tun Hussein Onn Malaysia).
Dayani, M. and Gelbard, R., 2015. Automatic Conversion of Software Specification into a Gantt-chart subject to Organization’s Constraints. Procedia Computer Science, 64, pp.73-78.
de Jonge, B., Dijkstra, A.S. and Romeijnders, W., 2015. Cost benefits of postponing time-based maintenance under lifetime distribution uncertainty. Reliability Engineering & System Safety, 140, pp.15-21.
Frost, J.J., Sonfield, A., Zolna, M.R. and Finer, L.B., 2014. Return on investment: a fuller assessment of the benefits and cost savings of the US publicly funded family planning program. The Milbank Quarterly, 92(4), pp.696-749.
Hui, Y., Yan, Y., Quanyu, W. and Zhiwen, C., 2015, June. Compare Essential Unified Process (EssUP) with Rational Unified Process (RUP). In Industrial Electronics and Applications (ICIEA), 2015 IEEE 10th Conference on (pp. 472-476). IEEE.
Model, W., 2015. Waterfall model. Luettavissa: https://www. waterfall-model. com/. Luettu, 3.
Rout, A., Sahoo, S.S., Thomas, S. and Varghese, S.M., 2017. Development of Customized Formulae for Feasibility and Break-Even Analysis of Domestic Solar Water Heater. International Journal of Renewable Energy Research (IJRER), 7(1), pp.386-398.
Wittenberg, R., Anderson, R., Read, S. and Knapp, M., 2017. Why no reliable estimate can be produced for the rate of return on investment in primary prevention of dementia.
Free Membership to World’s Largest Sample Bank
To View this & another 50000+ free samples. Please put
your valid email id.
Yes, alert me for offers and important updates
Submit
Download Sample Now
Earn back the money you have spent on the downloaded sample by uploading a unique assignment/study material/research material you have. After we assess the authenticity of the uploaded content, you will get 100% money back in your wallet within 7 days.
UploadUnique Document
DocumentUnder Evaluation
Get Moneyinto Your Wallet
Total 5 pages
PAY 3 USD TO DOWNLOAD
*The content must not be available online or in our existing Database to qualify as
unique.
Cite This Work
To export a reference to this article please select a referencing stye below:
APA
MLA
Harvard
OSCOLA
Vancouver
My Assignment Help. (2021). System Analysis. Retrieved from https://myassignmenthelp.com/free-samples/coit11226-system-analysis/organizational-projects.html.
“System Analysis.” My Assignment Help, 2021, https://myassignmenthelp.com/free-samples/coit11226-system-analysis/organizational-projects.html.
My Assignment Help (2021) System Analysis [Online]. Available from: https://myassignmenthelp.com/free-samples/coit11226-system-analysis/organizational-projects.html[Accessed 18 December 2021].
My Assignment Help. ‘System Analysis’ (My Assignment Help, 2021)
My Assignment Help. System Analysis [Internet]. My Assignment Help. 2021 [cited 18 December 2021]. Available from: https://myassignmenthelp.com/free-samples/coit11226-system-analysis/organizational-projects.html.
×
.close{position: absolute;right: 5px;z-index: 999;opacity: 1;color: #ff8b00;}
×
Thank you for your interest
The respective sample has been mail to your register email id
×
CONGRATS!
$20 Credited
successfully in your wallet.
* $5 to be used on order value more than $50. Valid for
only 1
month.
Account created successfully!
We have sent login details on your registered email.
User:
Password:
MyAssignmenthelp.com delivers assignment help to millions of students of USA. We have in-house teams of assignment writers who are experts on wide ranges of subjects. We have appointed teams of native writers who provide assignment help to students in New York City and all over the USA. They are skilled assignment writers who successfully cater to search terms like do my assignment in the USA
Latest Management Samples
div#loaddata .card img {max-width: 100%;
}
MPM755 Building Success In Commerce
Download :
0 | Pages :
9
Course Code: MPM755
University: Deakin University
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answers:
Introduction
The process of developing a successful business entity requires a multidimensional analysis of several factors that relate to the internal and external environment in commerce. The areas covered in this current unit are essential in transforming the business perspective regarding the key commerce factors such as ethics, technology, culture, entrepreneurship, leadership, culture, and globalization (Nzelibe, 1996; Barza, 2…
Read
More
SNM660 Evidence Based Practice
Download :
0 | Pages :
8
Course Code: SNM660
University: The University Of Sheffield
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: United Kingdom
Answers:
Critical reflection on the objective, design, methodology and outcome of the research undertaken Assessment-I
Smoking and tobacco addiction is one of the few among the most basic general restorative issues, particularly to developed nations such as the UK. It has been represented that among all risk segments smoking is the fourth driving purpose behind infections and other several ailments like asthma, breathing and problems in the l…
Read
More
Tags:
Australia Maidstone Management Business management with marketing University of New South Wales Masters in Business Administration
BSBHRM513 Manage Workforce Planning
Download :
0 | Pages :
20
Course Code: BSBHRM513
University: Tafe NSW
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answer:
Task 1
1.0 Data on staff turnover and demographics
That includes the staffing information of JKL industries for the fiscal year of 2014-15, it can be said that the company is having problems related to employee turnover. For the role of Senior Manager in Sydney, the organization needs 4 managers; however, one manager is exiting. It will make one empty position which might hurt the decision making process. On the other hand, In Brisba…
Read
More
MKT2031 Issues In Small Business And Entrepreneurship
Download :
0 | Pages :
5
Course Code: MKT2031
University: University Of Northampton
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: United Kingdom
Answer:
Entrepreneurial ventures
Entrepreneurship is the capacity and willingness to develop, manage, and put in order operations of any business venture with an intention to make profits despite the risks that may be involved in such venture. Small and large businesses have a vital role to play in the overall performance of the economy. It is, therefore, necessary to consider the difference between entrepreneurial ventures, individual, and c…
Read
More
Tags:
Turkey Istanbul Management University of Employee Masters in Business Administration
MN506 System Management
Download :
0 | Pages :
7
Course Code: MN506
University: Melbourne Institute Of Technology
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answer:
Introduction
An operating system (OS) is defined as a system software that is installed in the systems for the management of the hardware along with the other software resources. Every computer system and mobile device requires an operating system for functioning and execution of operations. There is a great use of mobile devices such as tablets and Smartphones that has increased. One of the widely used and implemented operating syste…
Read
More
Tags:
Australia Cheltenham Computer Science Litigation and Dispute Management University of New South Wales Information Technology
Next
Our essay writers will gladly help you with:
Powered by essayworldwide.com